Our Project Timeline

Cochrane High Students alongside the solar panels.

pic_left_turbine_cu

The Wind Turbine is now in place near to the solar panels.



Phase III Timeline
Summer 2007 Priced out the cost of phase 3 and made a plan to fundraise
Sept 2007 – Sept 2008 Fundraised for phase 3
Spring 2009 Installed solar hot water system